README web version of /home/usg/OPS/MTS/readme_xml/readme_81027900
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
Special Execution Requirements
The COUNTS SHOULD ALWAYS BE BELOW THE SATURATION LIMIT for the peak of
the supernova PSF, but also high enough for proper background dominated performance.
PLEASE ADJUST best-guess DITs to obtain reasonable peak values. The supernova counts
CAN EXCEED SLIGHTLY THE LINEARITY LIMIT since the aim is to derive accurate astrometry
but NOT photometry. WE REQUEST IMMEDIATE ACCESS to all the ToO data acquired. This
is to enable a rapid reporting of the supernova progenitor identification from pre-explosion
images, and coordination of other follow-up observations of the supernova.
Special Calibration Information
ToO Information
This ToO programme should be activated soon after the discovery of a nearby
supernova with existing high resolution pre-explosion images of the supernova explosion
site. The PI (Mattila), or CoI (Smartt) will provide the exact coordinates, a finding
chart, and the relevant OB files written for the specific target (incl. AO ref.
information) at the time of triggering. These will be based on the already submitted
'template' OBs with their imaging parameters adjusted for the specific target.
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you have PSF reference star OBs, do the names of those OBs begin with
PSF_ ?
If there are Finding Charts attached to your OBs, is the field-of-view
of at least one of these charts 2' x 2' (with clearly labelled field orientation)
?
Have you clearly marked and labelled your wavefront reference objects
R1, R2, R3, ... (as specified in the NAOS Preparation Software) on your Finding
Charts ?
Have you specified the magnitude of the brightest object in the field-of-view
for each OB ?
Are there objects in any of your fields (including standard stars) which
are brighter than the limits specified in the User Manual and on NACO web Pages
?
If the previous answer is yes, have you given a list of OBs and a justification
for the brightness limit violation in the general description field ?
Last creation of page: Tue Oct 6 15:40:23 2009
If you have comments, please contact usd-help@eso.org