README web version of /home/usg/OPS/MTS/readme_xml/readme_81024300
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
This is a simple FORS2 long slit spectroscopy proogram in bad seeing conditions
of two bright elliptical galaxies NGC 4594 and NGC 3923. Because the slit is 2"
wide and we are interested in the absorption line spectroscopy, the "through slit"
image is not strictly required for the acquisition of the data.
For NGC 4594 we have defined 5 OBs. In each OB the slits are aligned and parallel
to the minor axis of the galaxy at PA=0.
For NGC 3923 we have defined 6 OBs. 3 OBs are aligned and parallel to the galaxy
major axis at PA = 45, and three are aligned and parallel to the galaxy minor axis
at PA=135.
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you have prepared your finding charts with tools other than FIMS,
do they comply with the specifications on the FORS1 Phase 2 web page ?
Last creation of page: Tue Oct 6 15:40:23 2009
If you have comments, please contact usd-help@eso.org