README web version of /home/usg/OPS/MTS/readme_xml/readme_81021600
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
In this programme a detailed map of stellar surface structures on zeta
Andromedae is constructed using high resolution spectra. It is crucial that the
9 spectra needed for the programme are evenly distributed over the 17.8 day stellar
rotation period.
These observations are complementary to a visitor mode run with VLTI scheduled for
the nights starting 14th, 16th and 18th of September (second half of the night).
Ideally part of the UVES observations (OBs: zeta_And_2, zeta_And_3 and zeta_And_4)
should be obtained during the same nights as the VLTI observations. Also, a radial
velocity standard (OB: zeta_And_RVstd) should be observed once (anytime between
12-30 Sep).
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
It is crucial that the OBs are executed during the specified dates:
OB time interval
zeta_And_1 13 Sep (00:00 UT) - 14 Sep (12:00 UT)
zeta_And_2 15 Sep (00:00 UT) - 16 Sep (12:00 UT)
zeta_And_3 17 Sep (00:00 UT) - 18 Sep (12:00 UT)
zeta_And_4 19 Sep (00:00 UT) - 20 Sep (12:00 UT)
zeta_And_5 21 Sep (00:00 UT) - 22 Sep (12:00 UT)
zeta_And_6 23 Sep (00:00 UT) - 24 Sep (12:00 UT)
zeta_And_7 25 Sep (00:00 UT) - 26 Sep (12:00 UT)
zeta_And_8 27 Sep (00:00 UT) - 28 Sep (12:00 UT)
zeta_And_9 29 Sep (00:00 UT) - 30 Sep (12:00 UT)
Note that the scientific goals of the programme can still be reached if one phase
is missing, i.e. the observations should still be continued even if one observation
is missed.
The radial velocity standard (OB: zeta_And_RVstd) can be observed anytime during
the interval 12-30 Sep.
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you specified the S/N ratio at given wavelength in the User Comments
field of each OB?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you need secondary guiding, are there suitable objects within 30 arcsec
from your target ?
Last creation of page: Tue Oct 6 15:40:23 2009
If you have comments, please contact usd-help@eso.org