Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
The aim of this program is to monitor accurate radial velocities of a
sample
of 3 red giant stars. This to disenthangle the intrinsic contribution (eg from pulsations)
and
the genuine RV signal due to companion(s). The monitoring is required on two time
scales.
1) on the time-scale of 2-3 nights (on two separate occasions, 12-15 observations),
and
2) on the time scale of the complete semester (15-20 observations).
We rather obtain as many observations of one of the three stars, then a bit on each
star!
** HIP_85355 is first priority **. It can be observed during the whole semester.
Most optimal time (for the measurements of the short time-scale variations) is May-July
** HIP_3419 and HIP_7844 are second and third priority** They are observable from
June.
Most optimal time (for the measurements of the short time-scale variations) is
Aug-Sep.
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
The crucial aspect of this programme is to sample the radial velocity
variations on two
different time-scales, 1) on 2-3 day time-scale, and 2) on a 4-5 month time scale.
For 1) we require on two occasions 12-15 observations spanning 2-3 nights.
The observations should be spaced at least 20 minutes apart. For example,
5 observations on night 1, 5 observations on night 2, and 2 observations on night
3.
For 2) we need 15-20 observations spanning as large part of the semester as possible.
This to sample time scales up to 4-5 months. These observations should be taken
at least
3 nights apart.
We rather obtain as many observations of one of the three stars, then a bit on each
star.
** HIP_85355 is first priority **. It can be observed during the whole semester.
Most optimal time (for the measurements of the short time-scale variations) is May-July
** HIP_3419 and HIP_7844 are second and third priority** They are observable from
June.
Most optimal time (for the measurements of the short time-scale variations) is
Aug-Sep.
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
Last creation of page: Tue Oct 6 15:40:23 2009