README web version of /home/usg/OPS/MTS/readme_xml/readme_81013800
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
The purpose of this observing run is to obtain circular spectropolarimetry
of the black hole binary Cyg X-1 at 7 epochs distributed over the orbital period
of 5.6 days. Each OB (Cyg_X_1_phase1... Cyg_X_1_phase7) has to
be executed on specific nights to obtain good phase coverage. It is important to
obtain these observations as close as possible to the quasi-simultaneous observations
scheduled on other telescopes: May 20-23 on Korean BOAO 1.8m telescope, May 17-27
and June 10-29 on Peak Terskol 2m telescope.
The list of suitable nights for each OB is given in the section "Time-Critical Aspects".
Waiver Requests
We submitted a Waiver Request 381.D-0138A.01.WAV on January 17 to use
the non-standard readout mode 200kHz,1x1,low, and for the length of the OB of 1h26m.
The request was approved
on January 22.
Critical Observing Condition Constraints
Time-Critical Aspects
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you have prepared your finding charts with tools other than FIMS,
do they comply with the specifications on the FORS1 Phase 2 web page ?
Last creation of page: Tue Oct 6 15:40:23 2009
If you have comments, please contact usd-help@eso.org