README web version of /home/usg/OPS/MTS/readme_xml/readme_81009500
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
This observation run is the first of a pair of observations requested
to be executed with a time interval of the order of 3 months. This part (A) should
preferentially be executed in May, and the second one (part B) in August, or in
the beginning of September.
The run is subdivided in two parts, referred to as 1 and 2, that should preferentially
be executed during the same night. Each part is constituted of an observation of
the target, and one of the interferometric reference.
The preferred complete sequence for this run is:
Target_1
Reference_1
Target_2
Reference_2
This run is prepared to provide two calibrated visibility triplets of the target.
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
The time interval between the two runs (A and B) should be of the order
of 3 months in order to sample a long period orbital time-scale. This time interval
can not be much longer because of airmass constraints. The sidereal time constraints
are requested to obtain a better sampling of the u,v plane during the observing
run.
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
Did you indicate for each science star OB the corresponding calibrator
star OB (and vice versa) in the 'Instrument Comments' field ?
Did you check that your chosen calibrator is bright enough for the instrument
mode used ?
If you use calibrator stars which are not in the CalVin database, did
you specify their characteristics in the README file and in the OBs ?
Do you use the same DIT for pairs of science target and associated calibrator?
Are the magnitudes of science target and calibrator within +/- 1 mag
?
Did you verify that your coordinates are as accurate as possible (2Mass
coordinates recommended) and that they include proper motions if available ?
Did you specify the LST range of the calibrators such that they cover
the range from 30 min before the start of the LST range of the science target to
30 min after the end of the LST range of the science target ?
Last creation of page: Tue Oct 6 15:40:23 2009
If you have comments, please contact usd-help@eso.org