README web version of /home/usg/OPS/MTS/readme_xml/readme_81009100
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
Each OB should be executed only once.
The possible observing dates are given below and in the 'time intervals' of each
target. On nights where both targets are observable, we have used the 'user priority
field' since there is only time to observe one target per night because NGC6791
is always at high airmass.
The PHASE in the below list is the last digit in the OB. An example: PHASE 1 for
star6840 corresponds to the OB NGC6791_6840_1. A '-' means that this taget should
not be taken on that night.
Date at start | PHASE for | PHASE for
of the night | star6840 | star12390
---------------------------------------
Oct 1 | - | 1
Oct 2 | - | 1
Oct 4 | - | 1
Oct 6 | - | 1
Oct 9 | - | 1
Oct 11 | - | 1
Oct 14 | - | 1
Note that each target has to be observed at many different orbital phases and is
scheduled accordingly. This means that depending on which nights the individual
observations are carried out, there may be dates in the above list, where no OB
can be done, if both targets have already been observed at the phases corresponding
to that date.
Note also that because of the declination of NGC6791, there is only a small time
window each night, where the targets can be observed. This window will grow smaller
and smaller, and in October the airmass constraint will have to be disregarded.
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you specified the S/N ratio at given wavelength in the User Comments
field of each OB?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you need secondary guiding, are there suitable objects within 30 arcsec
from your target ?
Last creation of page: Tue Oct 6 15:40:23 2009
If you have comments, please contact usd-help@eso.org