README web version of /home/usg/OPS/MTS/readme_xml/readme_80507501
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
The purpose of this observing run is to obtain circular spectropolarimetry
of the single active giant FK Comae at 9 epochs distributed over the rotational
period of 2.4 days. The dates in April for obtaining the full phase coverage are
given in the section Time Critic Aspects. If there are still missing phases after
April, we will submit a list of suitable dates for May and June.
IMPORTANT note for the night astronomer: if the seeing is better than 1 arcsec,
the observations should be checked for saturation and the exposure time decreased
if needed. The signal, however, should be always more than 10 000 ADU.
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
It is important that the execution date of each OB correspond to one of
the dates indicated below:
OB name possible dates (the actual date of observations, i.e., date after midnight)
FK_Com_phase6 26.04, 28.04
Or as ordered by date:
date OB name
25.05 phase has been obtained already
26.04 FK_Com_phase6
27.04 phase has been obtained already
28.04 FK_Com_phase6
29.04 phase has been obtained already
30.04 phase has been obtained already
If there are missing phases after April, we will provide a list of dates for May
and June.
Special Execution Requirements
Each OB should be executed on specific dates. Suitable dates are given
in the section Time-Critical Aspects. If for any reason any of the nine OBs is not
executed by the end of April, we will submit a list of suitable dates for May and
June.
IMPORTANT note for the night astronomer: if the seeing is better than 1 arcsec,
the observations should be checked for saturation and the exposure time decreased
if needed. The signal, however, should be always more than 10 000 ADU.
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you have prepared your finding charts with tools other than FIMS,
do they comply with the specifications on the FORS1 Phase 2 web page ?
Last creation of page: Tue Oct 6 15:40:23 2009
If you have comments, please contact usd-help@eso.org