README web version of /home/usg/OPS/MTS/readme_xml/readme_80504700
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
This DDT is to do MR spectroscopy at 1.06 micron with ISAAC of two faint
objects, named with their Id, 16793 and 2616. There are 5 x 1hr OB for each object,
10 hrs in total.
The first priority is 16793 for which the 5 OBs should be completed before starting
2616, the User priority has been set accordingly.
The DIT for spectroscopy is very long so as to have only 2 exposures per OB and
be background limited.
The acquisition for 16793 is on a ~ J = 15 reference star which is in the slit together
with the object
The acquisition for 2616 is on a ~ J = 17.5 star followed by a telescope offset
to bring the target in the slit. There is a J ~ 20 star which will fall as well
in the slit which could possibly be checked at the end of the acquisition template.
The Moon can be a problem for these observations if too close to the Moon. Please
try to avoid FLI=1 and less than 60 degrees from the Moon, but these constraints
can be violated if this can help to get the observations done.
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you submitted OBs for standard stars, did you use the provided StandardStar
templates ?
If you are using a specific offset pattern or position angle, did you
check carefully the definition in the manual ?
If you are doing spectroscopy, did you draw the slit on the Finding Charts
?
Did you enter the magnitude of the brightest star in the field-of-view
in the 'Instrument Comments' field of each OB ?
If you use the MoveToPixel acquisition, have you given clear instructions
on the FC and in the OB comment section as to how the field should be centered ?
Last creation of page: Tue Oct 6 15:40:22 2009
If you have comments, please contact usd-help@eso.org