README web version of /home/usg/OPS/MTS/readme_xml/readme_80085201
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
This is the spectroscopic run of our mos filler proposal.
Our goal is to observe 9 pointings using 18 OBs. Each pointing will be observed
twice, one exposure per OB.
The first OB will not have any offset while the second OB will have an offset of
about 1.1 arcsec along
the slit direction and in the direction of decreasing DEC, in order to reduce the
fringing due to the MR grism.
We have included nighttime calibrations (1 night flat+1 night arc) for each of the
18 OB.
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
Did you specify suitable guide stars for all your OBs using Guidecam
?
Did you check that the chosen guide stars are suitable for all the offset
positions and that they do not produce unacceptable vignetting of the field of view
?
Last creation of page: Tue Oct 6 15:40:22 2009
If you have comments, please contact usd-help@eso.org