README web version of /home/usg/OPS/MTS/readme_xml/readme_80068700
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
Intermediate spectroscopic observation of pre-main sequence stars
(PMS) in NGC1850. PMS have V spanning from 20 to 21. The immediate
goal of the proposal is to measure Halpha emission from these stars.
Target selection is based on WFPC2 image. To achieve target S/N of ~
10 per pix at V=21, we need 12 exposures of the same field (same
FLAMES configuration). Thus all 12 OBs are identical. For each OB
there are two finding charts: the first, at lower resolution (red
DSS), shows guide star + FACBs, the second, at higher resolution
(WFPC2 band f569w) shows the targets. The WFPC2 image and coordinate
system were registered against the UCAC2 catalogues, from where FACBs
and Guide Star were also selected.
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
Did you specify in your OBs the hour angle range for which your Target
Setup files are valid ?
Did you specify in your OBs the magnitudes of FACBs and Guide Star for
all your fields ?
Are the FACBs and Guide Star in the brightness ranges specified in the
FLAMES manual ?
Did you enter the expected signal to noise in your OBs ?
Last creation of page: Tue Oct 6 15:40:22 2009
If you have comments, please contact usd-help@eso.org