README web version of /home/usg/OPS/MTS/readme_xml/readme_80064300
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
This is an RRM run for observations of short duration GRBs visible from
Paranal within two hours of their discovery. We will trigger these observations
in the event that a burst with i) an apparent duration from its publically available
lightcurve of <3s or ii) is suggested by the initial GCN cicrcular to belong
to short duration class.
Under normal conditions we will activate an imaging run (VRI with duration depending
on the time frame for which the burst is visible from Paranal). Alternatively we
may active the spectroscopic 300V template (for example if the UVOT has reported
a bright optical counterpart), with the aim of obtaining an absorption redshift.
Waiver Requests
Critical Observing Condition Constraints
Given the nature of these ToO observations we do not place constraints
at this stage, but will fill these in upon the ToO/RRM request when submitted. In
general no constraints will be placed on RRM observations since they will be the
first of a given GRB. Constraints on ToO observations will depend upon the known
information about the burst at the time of the trigger
Time-Critical Aspects
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you have prepared your finding charts with tools other than FIMS,
do they comply with the specifications on the FORS1 Phase 2 web page ?
Last creation of page: Tue Oct 6 15:40:22 2009
If you have comments, please contact usd-help@eso.org