README web version of /home/usg/OPS/MTS/readme_xml/readme_80055000
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
We require a unique setup for these observations:
The instrument operator should mouse click on star
IRAS05247-6941, Its 13th Mag and the brightest star
in the area, see fc1.jpg.
Then we need an offset of -14.7 arcseconds so the star
will be BEHIND strip mask #11. This will limit the scattered
light from the star. We used the FIMS software to calculate
the offset. see fc1.jpg
The orienation of the strip mask should be 0, or
along the E-W axis.
The final position should be
RA 05:24:19.320 DEC -69:38:34.7 J2000
There are 6 OB's 5 @ 1 hour long, 1 @ 30 minutes long,
please try to observe all these within 1 week.
if it was 2 weeks that okay, too.
Flat fields: I have no idea what the exposure time should be
please assist. thanks
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
Special Execution Requirements
Special Calibration Information
We request flatfields, we have no idea what the
exposure time should be, please assist.
Also, we request flats for each night when
one of the OBs is observed.
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you have prepared your finding charts with tools other than FIMS,
do they comply with the specifications on the FORS1 Phase 2 web page ?
Last creation of page: Tue Oct 6 15:40:21 2009
If you have comments, please contact usd-help@eso.org