README web version of /home/usg/OPS/MTS/readme_xml/readme_80045600
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
The aim of this run is the measurement of the radial velocity curve and
determination of the orbital period of the white dwarf binary WD0837+185. We measured
RV variations in a set of
UVES spectra taken in a previous semester.
The period is unknown, values between few hours and some days are possible. This
determines our observing strategy. OBs should be distributed over a number of nights
as detailed below.
Please note, that the constraints on observing conditions are not very strict. Observations
under conditions slightly worse than specified are acceptable, if neceassary to
complete a time critical OB.
The WD0806-661 observations will be used for calibration purposes and can be taken
anytime.
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
Observing strategy for the science target (WD0836+185):
Two nights in which three OBs have to be executed (night1 and night2 OBs).
One night in which two OBs have to be executed (night3 OBs).
The remaining OBs should be carried out on a one OB per night basis.
The exact sequence of 3 OB, 2OB, 1OB nights is not critical, but it would be good
if very large gaps (>10 days) between nights with observations can be avoided.
All WD0837+185 OBs are identical.
Example of a possible schedule for the OBs:
Night 1: OBs WD0837_night1a, WD0837_night1b, WD0837_night1c
Start with WD0837_night1a as early as possible during the night.
_night1b should be best observed in the middle of the night and _night1c as late
as possible.
Night 2: OBs WD0837_night2a, WD0837_night2b, WD0837_night2c
Same as night 1
Night 3: OBs WD0837_night3a, WD0837_night3b
_nigh3a/_night3b are best taken at the begin/end of the night (or shortly after/before
rise/set of the object).
Other nights:
OBs: WD0837_later1, WD0837_later2, WD0837_later3, WD0837_later4, WD0837_later5
Execute one OB and only one, whenever possible.
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you specified the S/N ratio at given wavelength in the User Comments
field of each OB?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you need secondary guiding, are there suitable objects within 30 arcsec
from your target ?
Last creation of page: Tue Oct 6 15:40:21 2009
If you have comments, please contact usd-help@eso.org