README web version of /home/usg/OPS/MTS/readme_xml/readme_80041103
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
We are acquiring optical spectra of very faint targets with magnitudes
between 23-26. To do so, we have a total on-source integration time of 14 hours.
Each OBI is designed to first have an acquisition image taken with an exposure time
of 235 seconds using the R-band filter. This longer acquisition image enables some
of the targets to be visible in the through slit image. Each mask has a few brighter
targets with R~21-22 that should be visible. If not, please use the bright acquisition
stars for centering. Two consecutive science frames each of 30 minutes at the same
offset position will be taken for a total of 1 hour integration on-source. At the
end, we request a nighttime arc (calibration) lamp exposure. No nighttime flat
is required. We will use the daytime flat for calibration. The total execution
time for each OBI is 1.57 hours. We have been granted a waiver by ESO to design
our OBIs to be longer than 1 hour.
We do not need any additional observations of standard stars. We will use the regular
calibrations already observed that do not cost our program any time.
The above description of a single OBI is repeated 14 times each at a varying offset
position with offsets of 0.0,+1.0,-1.0,+2.0,-2.0 arcsecs along the slit that effectively
keeps all objects within the slits for all exposures since we have designed the
masks to have 3 arcsec of sky on each side of the targets for the pointing with
an offset of 0.0 arcsecs.
Thank you for the help in planning and carrying out these observations.
Sincerely,
John Silverman
Waiver Requests
Critical Observing Condition Constraints
Observations must be carried out in dark time and under good weather conditions.
Clear, Seeing=1.0, Airmass<~1.2, Moon illumination <~ 0.3 and distance to
the moon>~60 degrees
Time-Critical Aspects
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
Did you specify suitable guide stars for all your OBs using Guidecam
?
Did you check that the chosen guide stars are suitable for all the offset
positions and that they do not produce unacceptable vignetting of the field of view
?
Last creation of page: Tue Oct 6 15:40:21 2009
If you have comments, please contact usd-help@eso.org