README web version of /home/usg/OPS/MTS/readme_xml/readme_80040600
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
This run should start as soon as possible after the evening sunset of
UT 2007-10-10, and then observe continuously the target for 6.3 hours.
The nominal time for the OB is longer than 6.3 hours, however, p2pp has overestimated
the overhead since several of the offset have zero displacement. Therefore, the
real observing time is expected to be much less. Please, just abort the observations
once 6.3 hours have been reached.
See critical observing constraints section for important condition on seeing.
Waiver Requests
Critical Observing Condition Constraints
We require a dry (<50% percentile) and photometric atmosphere, but
we have no constraints on the seeing.
It is critical to avoid the persistance effect which, according to the SINFONI
manual, appears after ~10K ADU. The DIT we indicate in the OBs is optimized -according
to the ETC- for a FWHM V-band seeing of 0.9".
We propose two possible solutions if counts rise above 10k ADU:
* bad AO correction. This is the ideal solution since nothing else will need
to be adjusted and there will still be minimum overhead time.
* reduce DIT and increase NDIT. The idea is to keep NDIT*DIT=constant. Please,
if possible, avoid doing this more than once during the run
Non-time-critical run B can be executed before or after time-critical Run A.
Time-Critical Aspects
Ideally, this 6.3 hours continuous observations should start at 2007-10-10UT22:30,
however the Sun will still be up that day. Therefore, we request the beginning
of the observations as early as possible into twilight.
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
Did you indicate the magnitude of the brightest object in the field in
each SINFONI OB?
If you are using the AO: Did you indicate for every OB the magnitude
of the guide star, and its distance to the target (if any)?
If you submitted OBs for standard stars, did you use the provided StandardStar
templates?
If you are using a specific offset pattern or position angle: did you
check carefully the definition in the manual?
Did you make really sure that none of your OBs ever saturates the detector?
If you are using the AO: did you enter the correct Strehl Ratio (on-axis,
K-band) AND the seeing value in the constraint set?
Last creation of page: Tue Oct 6 15:40:21 2009
If you have comments, please contact usd-help@eso.org