Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
Time critical JHKs - Imaging of planetary Microlensing
event in progress in crowded Galactic Bulge field with the
aim to resolve the event from unrelated background sources.
To be observed as soon as possible, but valid until 31st October.
We prefer the use of the LGSF, but if the laser is not available,
we prefer an earlier NGS observation compared to a later laser
observation.
There are two suitable NGS marked as R1 and R2
in the finding chart(s)
NGS R1 is the safe first choice. If star R2 however turns out not
to be double and bright enough for the AO system then the NA can choose R2,
since it is closer to the target and may provide better corrections.
Scientific objective:
We want to separate the ongoing planetary Microlensing event
OGLE-2007-BLG-349 using NACO-S27-JHKs Imaging from
any unrelated background sources in order to get an estimate
of the magnitude and type of the lens, the planetary host star.
This observation will establish a reference epoch to be compared
to an epoch (P81) when the source star will not be magnified anymore.
We will not be able to spatially separate the lens star from the
source star (they are aligned within about 1 mas), but a two epoch
light curve will enable us to measure the flux of the lens using our
microlens model.
Obtaining this way a "direct" flux measurement of the planet host star
will yield to much more precise estimates of the mass and orbit of
the planet and the properties of its host than compared to
the standard analysis based on statistical assumptions of the
Galactic lens and source star population.
The earlier the observation of the first epoch (this OB) is
carried out the larger the gradient of the light curve and the
better the estimates of the lens and source star fluxes.
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
The earlier the event is observed, the more the source flux
will be still amplified, which benefits the scientific return
by providing a good gradient in flux with the planned 2nd epoch in Period 81
when the event will have ended.
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you have PSF reference star OBs, do the names of those OBs begin with
PSF_ ?
If there are Finding Charts attached to your OBs, is the field-of-view
of at least one of these charts 2' x 2' (with clearly labelled field orientation)
?
Have you clearly marked and labelled your wavefront reference objects
R1, R2, R3, ... (as specified in the NAOS Preparation Software) on your Finding
Charts ?
Have you specified the magnitude of the brightest object in the field-of-view
for each OB ?
Are there objects in any of your fields (including standard stars) which
are brighter than the limits specified in the User Manual and on NACO web Pages
?
If the previous answer is yes, have you given a list of OBs and a justification
for the brightness limit violation in the general description field ?