README web version of /home/usg/OPS/MTS/readme_xml/readme_79503501
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
Imaging of Asteroid/Comet Elst-Pizarro, a moving target. A simple point-and-shoot
program
for RI imaging.
Run A should be done before run B.
Finding chart: No finding chart have been submitted because the ephemeris prediction
is good enough (few arcsec) to secure proper pointing. Verification of star background
by DSS image on the fly is enough. We attach an recent image of the asteroid appearance.
Special note: Before executing the OB on the moving target please enter in the OB
==> RADEC of the asteroid at the epoch closest in time to the expected start
time of the OB
==> the motion rates in RADEC at the epoch closest in time to the expected
start time of the OB
Ephemeris: the attached ephemeris file lists for 15min time tags in UT the RADEC
of the asteroid, its RADEC motion rates, the airmass, the apparent visual magntiude,
the position angle of the tail direction (PSANG).
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you have prepared your finding charts with tools other than FIMS,
do they comply with the specifications on the FORS1 Phase 2 web page ?
Last creation of page: Tue Oct 6 15:40:20 2009
If you have comments, please contact usd-help@eso.org