README web version of /home/usg/OPS/MTS/readme_xml/readme_79502403
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
The two OBs in this run should be observed with the same setup during
the same observing night. This is the fourth of four runs approved, ideally this
set should be observed as close as possible to September 25st. Some of the emission
lines of the spectra could be saturated, this is ok, since we are interested in
the continuum. The observing constrains in this run are identical to the third
run and relaxed with respect to the original request. Observations can be done
with thin cirrus and seeing up to 1.8".
In order to start analyzing this data as soon as possible to fine-tune upcoming
observations, and as it has been done for the previous three runs, we would appreciate
if you can upload the data to the ESO ftp server right after the observations.
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?