README web version of /home/usg/OPS/MTS/readme_xml/readme_79502100
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
Simple LSS of two Galactic black hole candidates, as close in time as
possible with scheduled ULTRACAM observations of these targets in June (Chilean
nights beginning Jun 11,12,13,15 and 17). One target to be observed once, and one
target to be observed four times, all on different nights. A blue and a red spectrum
are obtained consecutively.
OBs
---
Note that for GX339-4, four OBs are submitted. These OBs are identical, except for
their name, and the time intervals entered in there for completeness.
Finding Charts
--------------
279.D-5021A.001.jpg : GX339-4 large field of view
279.D-5021A.002.jpg : GX339-4 zoom-in (target is expected to be bright, as on the
left)
279.D-5021A.003.jpg : SwiftJ1753 large field of view (target is invisible on this
old DSS image, though it is now brighter than the DSS limit)
279.D-5021A.004.jpg : SwiftJ1753 zoom-in (recent image showing the bright target)
Waiver Requests
Critical Observing Condition Constraints
None. The important aspect is to try and observe close in time to the
ULTRACAM observations. Of course, if conditions are changing rapidly, and waiting
an hour (say) is likely to result in much clearer skies, then please do wait a bit!
Time-Critical Aspects
These targets are variable, and we have a dedicated program to obtain
rapid photometry with ~10 ms time resolution with the visitor instrument ULTRACAM,
simultaneous with RXTE in X-rays. The ULTRACAM/RXTE schedule is as follows (all
times UT):
GX339-4
-------
Jun 12 (Chilean night beginning Jun 11) 05:25 : GX339-4_1.obx
Jun 14 (Chilean night beginning Jun 13) 06:07 : GX339-4_2.obx
Jun 16 (Chilean night beginning Jun 15) 05:15 : GX339-4_3.obx
Jun 18 (Chilean night beginning Jun 17) 07:26 : GX339-4_4.obx
SwiftJ1753.5-0127
-----------------
Jun 13 (Chilean night beginning Jun 12) 05:09 : SwiftJ1753.obx
The above times are the mid-points of the scheduled ULTRACAM observations. Please
try and observe as close as possible in time to the above (within a few hours).
Of course, if this is impossible then try and observe at least somtime on the same
night as ULTRACAM. In worst case, observation within a couple of nights might also
be useful.
Note : the GX339-4 OBs are actually identical to each other.
Special Execution Requirements
Targets are variable and exact magnitude is unknown, which explains the
multitude of finding charts provided. However, they are both expected to be bright
(intermediate or high state) currently. GX339-4 is likely to lie between V ~ 16.5
and 18. And SwiftJ1753.5-0127 is likely to be V~16.
In case the targets appear much brighter, then please just make sure that the final
spectra are not saturated, and if the targets are fainter, then you may need to
increase the acquisition/slit image exposure times.
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you have prepared your finding charts with tools other than FIMS,
do they comply with the specifications on the FORS1 Phase 2 web page ?
Last creation of page: Tue Oct 6 15:40:20 2009
If you have comments, please contact usd-help@eso.org