README web version of /home/usg/OPS/MTS/readme_xml/readme_79501500
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
This is a straighforward imaging run in two photometric bands (V,I) to
study the
new Bootes II Milky Way satellite candidate. Field 1 is aligned with the tentative
centre of the resolved galaxy as defined by a concentration of faint stars in the
SDSS data,
whereas field 2 is slightly off-centered. Bootes II has an estimated half light
radius
of 5.4 arcmin.
The scientific aim is to confirm the new Milky Way companion and to produce a deep
CMD reaching 2 magnitudes below the MSTO to study the underlying stellar population.
The FORS2 CCD frames will be photometrically calibrated using std star observations
from the
calibration plan.
A small pointing offset of 5 arcsec in RA and DEC between each exposure shall
help to remove the effects of bad pixels and the 4 arcsec gap between the two CCDs.
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you have prepared your finding charts with tools other than FIMS,
do they comply with the specifications on the FORS1 Phase 2 web page ?
Last creation of page: Tue Oct 6 15:40:20 2009
If you have comments, please contact usd-help@eso.org