README web version of /home/usg/OPS/MTS/readme_xml/readme_79091000
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
NTT SOFI lond slit low resolution blue and red grism (JH and HK) spectral
observations are required for our target, which is a very red brown dwarf (Rc-Ks
= 7.1).
NOTE that we require A0V telluric standards to be taken before and after each set
of JH & HK spectral observations.
Also, we require Nasmyth halogen lamp flats.
The execution time for this 079.C-0919(A) part is given as 41 minutes over the alloted
one hour. However, the time allocation for the 079.C-0919(B) part is under used
by 25 minutes, leaving 6 minutes longer than the alloted time for both parts of
the proposal. However, the DIT and NDIT's defined for the HK SOFI spectroscopy of
this target were conservatively chosen for better temporal sky line variation correction
which may not be optimal, and may therefore be modified at the time of the observations
by the more experienced NTT support astronomer.
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
Last creation of page: Tue Oct 6 15:40:20 2009
If you have comments, please contact usd-help@eso.org