README web version of /home/usg/OPS/MTS/readme_xml/readme_79072100
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
This program aims at taking stellar spectra of horizontal branch (HB)
stars in the globular cluster NGC5927 and simultaneously take spectra of turn off
(TO) stars in the same cluster. The main targets have been identified using images
taken with ACS on board HST. In addition to these targets we have identified possible
red giants and/or HB stars in the outer parts of the cluster using the 2MASS catalogue.
The HB stars identified on the ACS image are observed using UVES and all the other
are observed using MEDUSA fibres.
All coordinates in the target list are based on the 2MASS coordinate system.
The magnitudes of the HB stars in V is around 16.5-17. The TO stars have V around
20.
The HA has been checked for +/- 6 hours for nights in May, June, July, and August.
There were no conflicts.
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
Did you specify in your OBs the hour angle range for which your Target
Setup files are valid ?
Did you specify in your OBs the magnitudes of FACBs and Guide Star for
all your fields ?
Are the FACBs and Guide Star in the brightness ranges specified in the
FLAMES manual ?
Did you enter the expected signal to noise in your OBs ?
Last creation of page: Tue Oct 6 15:40:20 2009
If you have comments, please contact usd-help@eso.org