README web version of /home/usg/OPS/MTS/readme_xml/readme_79034400
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
General Overview
----------------
This programme's objective is to characterize the wind speed in the Venus mesosphere
from high resolution Doppler velocimetry. By using the derotator to adjust the slit
orientation, and offsetting the slit, it is possible to map the winds over the Venus
dayside using the large range of wavelengths provided by the instrument.
In the "perpendicular" configuration the slit is positioned perpendicularly to the
target's rotation axis, so as to extract spectra in the body's east-west direction.
The slit is then offset in a series of exposures so as to cover the Venus disk from
the northern high latitudes to the southern ones. This procedure is to be done twice,
with instrument configurations RED-580 and DIC2 437+860nm, one after the other,
i.e., MOV_Venus_day_Per_RED and MOV_Venus_day_Per_DIC.
Similarly, in the "parallel" configuration the slit is positioned parallel to the
central meridian and RED and DIC2 modes are executed consecutively (MOV_Venus_day_Par_RED
and MOV_Venus_day_Par_DIC).
NOTES:
------
Notation: in OB names, N1-1 and N1-2 means night 1, OB1 and night 1, OB2; N2 means
night 2, N3 means night 3, etc. "Par" means slit parallel to the Venus rotation
axis and "Per" means slit perpendicular to the axis.
Ephemerides are provided in files 079.C-0344A.004.eph and 079.C-0344A.par4.eph which
are attached to their respective OBs.
Since this is a Solar System target we are not submitting finding charts.
Note added 25 May:
If the acquisition image saturates, perhaps the night astronomer could replace the
ND3 filter specified with ND4 or ND5.
Waiver Requests
Waiver requests for using templates UVES_red_obs_expfree, UVES_cal_wavefree,
UVES_dic2_obs_expfree and UVES_dic2_cal_wavefree to be used with decker height 20"
were submitted on 6 February 2007 and approved on 7 February.
Critical Observing Condition Constraints
Sky transparency CLEAR and seeing < 1.2.
Ideally, the airmass should be less than 3, but since this target is only visible
with airmass<3 about 1h each night in the period specified we have relaxed the
airmass constraint to 4.0.
Time-Critical Aspects
Special Execution Requirements
Please make sure that order 70 (8646-8788 A) of the MIT CCD is not saturated
in the DIC2 OBs, as this would compromise the observation of the 5nu3 CO2 absorption
band. If that is the case the night astronomer could try to reduce the exposure
time.
The consecutive execution of OBs Red and DIC2 is particularly difficult due to the
limited period of observability of Venus in each night. When executing the RED and
DIC2 OBs consecutively, the night astronomer may set the telescope preset to "False"
in the second OB in order to save time (keeping the target in the same position
within the slit, within the guiding accuracy).
We have provided fine differential motions in the attached ephemerides files.
IMPORTANT: The position angle for the derotator is provided in the attached
ephemerides files. Please use it instead of the one provided in the OBs.
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you need secondary guiding, are there suitable objects within 30 arcsec
from your target ?
Last creation of page: Tue Oct 6 15:40:19 2009
If you have comments, please contact usd-help@eso.org