README web version of /home/usg/OPS/MTS/readme_xml/readme_79034102
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
The main characteristics of the observations are as follows. - The targets
have the following priority: early in P79: 1) BzK15504 : 4 OBs later in P79:
2) K20-ID9 : 3 OBs 3) K20-ID5-ID7 : 1 OB 4) K20-ID8 : 3 OBs - Sensitivity
is a key parameter for our science goals. It is more important to complete all observations
for the highest priority target before starting the observations for the next ones,
in order of priority. - There is no priority among the OBs for a given target.
OBs are named after the targets and with "-0", "-1", "-2", etc. appended for different
OBs. - The NACO pointings have field center coordinates and position angles so as
to cover the science target and at least one star (including the tip-tilt reference
star). This will provide the PSF calibration simultaneously with the science data,
minimizing overheads associated with PSF calibration. - The NDIT x DIT are either
4 x 30s or 3 x 45s. These were chosen so as to avoid saturation of the star in
each field that we will use for PSF calibration. - The brightest source in each
field is the tip-tilt star (TTS). - One field includes 2 of our science targets,
K20 ID5 and ID7. All other fields include only one science target. - The seeing
constraint is < 0.6" for ID9, ID5/ID7, and ID8, and is < 0.8" for BzK15504.
This is justified below. We have had difficulties in the past using STRAP in 0.5"
seeing conditions - this is a known problem that in good seeing and particularly
for fainter stars, much of the light goes between the APDs. To help alleviate this
potential problem we prefer to relax the seeing constraint for BzK-15504, for which
the TTS is faint and fairly close to the target (about 17"). For the other targets,
the TTS is significantly farther away, such that the AO constraint as requested
in the proposal. We would also like to note that for K20-ID9, K20-ID5/ID7, and
K20-ID8, the only TTS's available are rather faint. We are aware of the possible
limitations this could have on the AO performance. Our experience from the NACO+LGSF
commissioning in January 2007 and from our NACO+LGSF visitor mode run in March 2007
with TTSs of similar magnitudes and at comparable distances from the science targets
was successful and provided effective angular resolution of 0.1" - 0.2", which still
meets our scientific requirements. We are thus confident that these observations
can be carried out, and if the acquisition presents some difficulties, we would
like to kindly ask the observers to do their best, or to contact the P.I. if needed.
Remarks on the finding charts: - The finding charts are based on deep imaging,
with limiting magnitudes of Ks(5-sigma, Vega) = 20.8 mag for SOFI map of EIS/Deep3a
field for BzK15504, and Ks(5-sigma, Vega) = 22.6 mag for ISAAC map of GOODS/CDFS
field for the other targets. Therefore, to help during the field acquisition, the
brightest stars (from 2MASS-PSC catalogue with magnitudes in the range K(Vega) =
13-17 mag) are marked with the star symbols. - In the finding charts, the square
in thick solid line shows the nominal NACO pointing. The area outlined with dashed
squares indicates the
full region mapped accounting for the jitter box width.
Waiver Requests
Two Waiver Requests were submitted: 079.A-0341C.01.WAV : for an extension
of P2PP submission dealine until March 30. 079.A-0341C.02.WAV : for an increase
of the OB execution time limit to 1h20. One program change request was submitted:
USD-19287: for an instrument setup change to include H band for BzK15504
(submitted on March 30, 2007; Approved on April 03, 2007)
Critical Observing Condition Constraints
Transparency constraints: - For all OBs, CLEAR sky transparency conditions
is acceptable. Moon constraints: - Since our TTSs have V = 16 or fainter, we have
set the constraints for moon illumination and moon distance to 0.7 and 50 degrees,
respectively, following the recommendations from the ESO NACO P2PP Web pages (http://www.eso.org/observing/p2pp/NACO/NACO-P2PP.html#Additional2).
Seeing constraints: - Seeing < 0.8" for BzK15504 to help alleviate the potential
problem in using STRAP that much of the light falls between APDs in very good seeing
for faint TTS. For the other targets, seeing < 0.6" because their TTS is significantly
farther away so good seeing becomes then more critical given the poorer AO performance
for larger target-TTS distances (see comments
in General Description).
Time-Critical Aspects
Special Execution Requirements
As we explain in the General Description, the targets are prioritized
and the observations of the higher priority targets should be completed before starting
on a new target. Priorities are as follows: early in P79: 1) BzK15504 : 4 OBs
later in P79: 2) K20-ID9 : 3 OBs 3) K20-ID5-ID7 : 1 OB 4) K20-ID8 : 3 OBs
We have also noted in the General Description that some of our TTSs are rather
faint. While from our experience during NACO+LGSF commissioning and GTO run on
March 25-27, 2007, we are confident the observations can be carried out and meet
our scientific requirements, please do not hesitate
to contact the PI in case of difficulties.
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you have PSF reference star OBs, do the names of those OBs begin with
PSF_ ?
If there are Finding Charts attached to your OBs, is the field-of-view
of at least one of these charts 2' x 2' (with clearly labelled field orientation)
?
Have you clearly marked and labelled your wavefront reference objects
R1, R2, R3, ... (as specified in the NAOS Preparation Software) on your Finding
Charts ?
Have you specified the magnitude of the brightest object in the field-of-view
for each OB ?
Are there objects in any of your fields (including standard stars) which
are brighter than the limits specified in the User Manual and on NACO web Pages
?
If the previous answer is yes, have you given a list of OBs and a justification
for the brightness limit violation in the general description field ?
Last creation of page: Tue Oct 6 15:40:18 2009