README web version of /home/usg/OPS/MTS/readme_xml/readme_79013800
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
This run consists of imaging several PNe (a short exposure and several
long, jittered, exposures each). Due to the extended nature of each target, we need
the nebulae to be positioned in the centre of the Master chip. Thus, we have slightly
modified target coordinates so as to achieve it (even after applying rotation offsets).
Please keep in mind that the Finding Chart provided is centered on the PNe (and
not on the Telescope preset target coordinates).
Waiver Requests
An additional target, namely Hen 2-186 (16 59 36.064 -51 42 06.46 J2000.0),
and the use of filter OIII#589 for imaging the target M2-9 (in addition to the originally
requested NII#653) were requested on January 24th. Both were approved on January
25th.
Critical Observing Condition Constraints
Time-Critical Aspects
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
Last creation of page: Tue Oct 6 15:40:18 2009
If you have comments, please contact usd-help@eso.org