README web version of /home/usg/OPS/MTS/readme_xml/readme_79008500
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
This UVES program aims at a high-resolution study of the white dwarf SDSS1228+1040,
which has
a circumstellar disc of metal rich material. We have detected in intermediate resolution
spectroscopy Mg 4481 in absorption in the WD atmosphere, and CaII 8500-8650A in
emission.
Here we want (a) to obtain high resolution, high S/N spectra of those features,
(b) probe for additional absorption/emission lines, and (c) to test for variability
of the already known Mg and Ca lines on time scales of months.
For purpose (b), we have defined one OB, SDSS1228_UVES_EXT with the bluest grating
to extend the existing spectroscopy as far into the blue as possible. This OB can
be executed at any time in P79.
For purpose (c), we have defined OBs SDSS1228_UVES_1 to _3, with time constraints
to be done in April, May, and June, respectively. The exact timing is not critical,
we would just like to get those three spectra spanning the maximum possible temporal
baseline in P79. It would be beneficiual for the program if it could be started
before the official begin of P79, e.g. in March, to spread out those three OBs over
a period of 4 months.
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
We have defined OBs SDSS1228_UVES_1 to _3, with time constraints to be
done in April, May, and June, respectively. The exact timing is not critical, we
would just like to get those three spectra spanning the maximum possible temporal
baseline in P79. It would be beneficial for the program if it could be started before
the official begin of P79, e.g. in March, to spread out those three OBs over a period
of 4 months.
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you need secondary guiding, are there suitable objects within 30 arcsec
from your target ?
Last creation of page: Tue Oct 6 15:40:17 2009
If you have comments, please contact usd-help@eso.org