README web version of /home/usg/OPS/MTS/readme_xml/readme_79005500
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
This is a spectroscopic run that consists of 6 OBs, corresponding to 6
stars. Each star is observed with the same instrument setup (dichroic 1 with central
wavelengths 390nm and 580 nm) and in the same way (3 exposures of 16min each). The
goal is to combine 3 exposures per star to obtain spectrum for each of the 6 target
stars. Each spectrum will consist of two spectral regions produced by two CCDs:
330-450 and 480-680 nm.
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you need secondary guiding, are there suitable objects within 30 arcsec
from your target ?
Last creation of page: Tue Oct 6 15:40:17 2009
If you have comments, please contact usd-help@eso.org