README web version of /home/usg/OPS/MTS/readme_xml/readme_78502201
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
This proposal monitors two planetary transits (one for each observing
run); therefore, timing constrains are critical. The observation of each transit
will last 5 consecutive hours, therefore we have prepared 5 one hour OBs in order
to cover each transit. We have selected the I filter (instead of V) because the
second transit will run into the twilight and therefore observations will be less
affected by it.
There is a very bright star near the target object that it is important to leave
outside the frame even if this means that the target object will not be centered
in the field.
There are 3 possible transits events and we need to observe two of them (one for
each observing run), their timings are indicated in the OBs. To observe the two
earliest events would be the best given that they are farther from the twilight,
the third should only be observed in case of technical or weather problem in one
of the first two.
The finding chart is an image taken in the R filter. Its size is approximately 2.5
arcmin.
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you have prepared your finding charts with tools other than FIMS,
do they comply with the specifications on the FORS1 Phase 2 web page ?
Last creation of page: Tue Oct 6 15:40:17 2009
If you have comments, please contact usd-help@eso.org