README web version of /home/usg/OPS/MTS/readme_xml/readme_78080001
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
This program aims to obtain high SNR spectra of the planetary candidate
2M1207b. The target itself is ~0.75" from the parent star. The parent star is a
brown dwarf (M8) with K=12, H=12.4, J=13.0, R=15.6, B=18.9. The target itself is
K=17, H=18.1, J~19. (B and R values are from USNO-B2, J, H and K from 2MASS), located
at PA 125 degrees from the parent.
Two sets of OBs are submitted, one for NGS, the other for LGS. In the NGS case,
the very red parent star is to be used as the NGS reference. For the LGS, the parent
star has too faint a V magnitude (it is below the V=17 limit), so instead we chose
a blue object ~7" away. This blue object is at 2MASS coordinates 12:07:34.001, -39:32:58.68,
and has K=14.9, H=14.9, J=15.4, R=15.9, B=16.5 (B and R values are from USNO-B2,
J, H and K from 2MASS). It should work well as a tip-tilt NGS reference.
Waiver Requests
Waiver 078.C-0800B.01 was submitted, requesting NGS observations alone,
and also requesting that tellurics be taken at 0.1" scale for all OBs, so that there
would not be a need to define additional OBs for tellurics.
The request for NGS observations alone has been accepted (on 22.09.06), so I would
like to request NGS observations as soon as possible. If the LGS is up and running
by then, the LGS set of OBs should be used, but please do not delay program execution
due to lack of availability of the LGS. NGS only operations should be commenced
as soon as conditions permit.
The latter request (tellurics at 0.1" pixel scale as part of the standard calibration)
was accepted, as it is normal procedure for SINFONI anyway, and was just a misunderstanding
by the PI.
Critical Observing Condition Constraints
Time-Critical Aspects
Special Execution Requirements
Special Calibration Information
We request that tellurics at air-mass similar to the object are observed
at 0.1" pixel scale, so that correct telluric calibration of the data can be carried
out. Correct telluric calibration is very critical to this program. We would also
like to request that the tellurics are of "hot" type, namely O or early B stars.
The J band calibration for solar-type tellurics is much more difficult.
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
Did you indicate the magnitude of the brightest object in the field in
each SINFONI OB?
If you are using the AO: Did you indicate for every OB the magnitude
of the guide star, and its distance to the target (if any)?
If you submitted OBs for standard stars, did you use the provided StandardStar
templates?
If you are using a specific offset pattern or position angle: did you
check carefully the definition in the manual?
Did you make really sure that none of your OBs ever saturates the detector?
If you are using the AO: did you enter the correct Strehl Ratio (on-axis,
K-band) AND the seeing value in the constraint set?
Last creation of page: Tue Oct 6 15:40:17 2009
If you have comments, please contact usd-help@eso.org