README web version of /home/usg/OPS/MTS/readme_xml/readme_78070100
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
The main goal of this project is to put firm constraints on the primordial
He abundance (Yp) by precisely deriving the Yp vs. dY/dZ slope using a
large sample of very metal deficient emission line galaxies.
Additionally, we wish to study the spectral energy distribution of our sample galaxies
around the Balmer discontinuity and look for high-ionization emission lines in their
blue spectral range.
Therefore it is important for this project to observe all targets
at low airmass (<1.3) or with the slit oriented along the parallactic angle.
This project can be executed at moderate seeing conditions (fwhm < 1.2) it requires,
however, clear sky.
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you have prepared your finding charts with tools other than FIMS,
do they comply with the specifications on the FORS1 Phase 2 web page ?
Last creation of page: Tue Oct 6 15:40:16 2009
If you have comments, please contact usd-help@eso.org