README web version of /home/usg/OPS/MTS/readme_xml/readme_78054203
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
The result of this program is a single spectrum of the bright Be star
zeta Tau to be used:
a) to define the parameters of the interferometric AMBER observations to be executed
on Dec 11/12, 2006 with the aim to detect and model the global (density wave) oscillations
in the circumstellar disk of
the star. The period of the oscillation is 1500 days.
b) to model the emission lines (Br gamma and He I 2.06) consistently with the interferometric
and polarimetric observations of the circumstellar disk.
Waiver Requests
The execution time of 0.4 hour was approved by Fernado Comeron on August
4, 2006. This permits us to increase NDIT to meet the service rules for the telescope
offsets (>1min).
Observations of the target of V-3 mag giving a CCD integration level higher than
the linearity limit
(Waiver ID: 78.D-0542D.01) was approved on August 8, 2006.
The lower the flux yielding the integration level well within the linearity range
should be obtained by:
a) executing the OB under inferior weather conditions - seeing worse than 2.0 and/or
airmass larger than 2.0 and/or thick clouds are acceptable.
b) if still necessary, placing the star slightly out of the slit.
Critical Observing Condition Constraints
The star is very bright V= 3.03 mag. The ISAAC observations can be executed
almost under any conditions, including thick clouds. In fact, the poor weather conditions
can help to solve the problem of the too
high brightness of the target.
Time-Critical Aspects
In order to use the ISAAC spectrum both for modeling of the disk and definition
of the AMBER observations, we need to execute it not too early before our AMBER
run (to minimize the effect of disk variability) but some days before the AMBER
run in order to have still some time to reduce and analyze the ISAAC spectrum and
prepare the AMBER observations. Because no ISAAC service observations are scheduled
for early December, the period Nov 23 - 28 is the best available choise. Please
do not
execute the observations earlier.
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you submitted OBs for standard stars, did you use the provided StandardStar
templates ?
If you are using a specific offset pattern or position angle, did you
check carefully the definition in the manual ?
If you are doing spectroscopy, did you draw the slit on the Finding Charts
?
Did you enter the magnitude of the brightest star in the field-of-view
in the 'Instrument Comments' field of each OB ?
If you use the MoveToPixel acquisition, have you given clear instructions
on the FC and in the OB comment section as to how the field should be centered ?
Last creation of page: Tue Oct 6 15:40:16 2009
If you have comments, please contact usd-help@eso.org