README web version of /home/usg/OPS/MTS/readme_xml/readme_78035501
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
This FEROS observing run is to support the interferometric monitoring
of the bright late B-type supergiant beta Orionis (Rigel). The interferometric monitoring
is carried out with AMBER at the VLTI in the Br gamma line with high spectral resolution
(R=10000).
The FEROS observations are supposed to provide complementary information in the
optical spectrum, in particular the Halpha and higher Balmer lines.
The scientific goal of these observations is to constrain for the first time interferometrically
the actual extent and spatial distribution of the circumstellar wind structures
in a massive supergiant, which have been established from optical spectroscopic
monitioring observations similar to the FEROS observations requested here.
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
The execution of the 18 submitted OBs should be distributed over the whole
observing period from October to March.
A minimum of 3 days between the consecutive execution of two OBs is required.
According to the P78 schedule, 9 service mode blocks are available at the 2.2m over
the 6 months, i.e.,
2 OBs should be executed per service mode block with at least 3 days between the
two OBs.
Special Execution Requirements
The ETC estimate of 1 second exposure time to achieve a S/N of 300 at
Halpha is quite rough and will depend critically on the actual observing conditions.
Main limitation will be the ability to center the very bright target on the fiber
entrance.
Therefore, please adjust the exposure time to achieve a minimum S/N of 300 while
not saturating the detector.
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
Did you set 'New Preset' flag in all acquisition templates to 'True'?
If you use any lamp, did you check that it should never be left on at
the end of any OB?
Last creation of page: Tue Oct 6 15:40:15 2009
If you have comments, please contact usd-help@eso.org