README web version of /home/usg/OPS/MTS/readme_xml/readme_78035500
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
These observations try to obtain for the first time interferometric spectroscopic
time-series observations of the late-type B
supergiant ? Orionis (B8 Ia). From optical Heros observations it is well-established
that ? Ori has a systematically structured and rotationally modulated stellar wind.
However, little is known about the actual extent and spatial distribution of these
structures. The analysis of the wind line-profile and visibility variations in the
new high-resolution Amber Br? and optical Feros spectra will permit a rigorous assessment
of the nature of the inhomogeneities in the outer atmospheric layers and the wind
of this this prototypical star and will for the first time allow to ?picture? the
structured wind of a hot massive star.
The AMBER observations aim at montioring the target over the complete observing
period with about one calibrated visibility per month (6 visits in the months November
to March). The main goal is to obtain a time sequence of differential phase closure
observations of the Br? line with high spectral resolution (HR-K mode in the 2.159
- 2.173 micron range).
The AMBER observations are complemeted by parallel FEROS optical spectroscopy at
La Silla over the same span.
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
The execution of the 6 submitted OBs should be distributed over the whole
observing period.
According to the P78 schedule, 6 service mode blocks are available for the VLTI
with
the UTs in the months from November to March, i.e., 1 Sci OB + 1 Cal OBs should
be
executed per VLTI service mode block. This will lead to the requested one observation
per month over 6 months.
The preferred baseline is UT1-UT3-UT4.
The observations should be carried out in the window of +/- 2 hrs from the meridian.
HOWEVER: if scheduling constraints / weather do not allow to fulfill the above requirements,
observations at higher airmass and with any other UT configuration are acceptable.
Priority has to be given to the monthly visit of the object.
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
Did you indicate for each science star OB the corresponding calibrator
star OB (and vice versa) in the 'Instrument Comments' field ?
Did you check that your chosen calibrator is bright enough for the instrument
mode used ?
If you use calibrator stars which are not in the CalVin database, did
you specify their characteristics in the README file and in the OBs ?
Last creation of page: Tue Oct 6 15:40:15 2009
If you have comments, please contact usd-help@eso.org