README web version of /home/usg/OPS/MTS/readme_xml/readme_78031900
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
Star formation at low metallicity: the morphology of young stellar objects
in the SMC
=====================================================================================
Simple point-and-shoot imaging in Js and Ks of a small field (several arcsec) around
a compact red source (position marked in the findercharts by a circle) from the
Spitzer survey (S3MC). The aim is to (1) identify the near-infrared counterpart,
(2) obtain photometry at Js and Ks for it, and (3) check whether the source is multiple
or diffuse.
Large field is chosen for large area coverage (benefits photometric calibration
and serendipitous science). DITs are 5 sec and 4 sec for Js and Ks, respectively.
Finder charts cover the inner 2'x2' centred on the target.
We aim for Js=21 and Ks=19 at S/N=10. Calibration is possible against catalogued
2MASS sources in the fields (i.e. no special standard star measurements are required).
Priorities are based upon target selection for other observing runs.
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
Last creation of page: Tue Oct 6 15:40:15 2009
If you have comments, please contact usd-help@eso.org