README web version of /home/usg/OPS/MTS/readme_xml/readme_78024601
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
This program is aimed at imaging SNe in their nebular phase or during
transition to their nebular phase. Our targets are 3 Type Ib/c core-collapse SNe,
one of which (SN2006aj) was associated with an X-ray Flash, and SN2005hk, suspected
to be mistyped as Ia and to be actually a core-collapse SN. This photometry serves
primarily the purpose of calibrating precisely the simultaneous spectra.
SUMMARY TABLE FOR OBSERVATIONS TO COMPLETE THE RUN (SN2006jc):
20-30 MARCH:
spectroscopy D-0246(A) FORS2 | photometry D-0246(B) FORS1 or FORS2
SN2006jc_MARCH_I_1 | SN2006jc_MARCH_fors1 or SN2006jc_MARCH_fors2
SN2006jc_MARCH_I_2 |
SN2006jc_MARCH_I_3 |
SN2006jc_MARCH_I_4 |
SN2006jc_MARCH_I_5 |
|
CAL_GD71_MARCH_I (standard connected |
to the observations of SN2006jc) |
The target will be faint, for the spectroscopy we putted an offset from the star
number 1 (see finding chart)
Since in the last run, we had some problems with the standard of the calibration
plan,
we would like that the OB "CAL_GD71_MARCH_I" will be executed during the same night
of
the OB "SN2006jc_MARCH_I_1".
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
The spectroscopy (with FORS2, Run A, scheduled in class B) will trigger
the photometry
(with FORS1, Run B, class A) as a "time critical" observation for execution "as
soon as
possible" - ideally during that night. For convenience, we have prepared, besides
FORS1 photometric OBs, also FORS2 photometry OBs, in case it is judged more convenient
to perform - for some or all targets and/or epochs - both spectroscopy and photometry
with same instrument. This is not in contradiction with the Phase I proposal: although
we had then designated FORS1 and FORS2 as primary instruments for photometry and
spectroscopy, respectively, we had also indicated that the instruments could be
alternated.
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you have prepared your finding charts with tools other than FIMS,
do they comply with the specifications on the FORS1 Phase 2 web page ?
Last creation of page: Tue Oct 6 15:40:15 2009
If you have comments, please contact usd-help@eso.org