README web version of /home/usg/OPS/MTS/readme_xml/readme_78003700
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
This programme (run A) aims at looking for very short period planets around
the two components of a wide binary system. Both stars of the system are to be
monitored during five consecutive nights, with one observation of each star per
night.
Run B of this project will look for longer period planets. OB's of runs A and B
should not be executed on the same night.
NOTE: the stars are separated by 8 arcsec, so no finding charts are made. Component
"A" is clearly brighter than "B"
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
The programme aims at detecting short period planets. The two targets
are to be observed once per night on five consecutive nights. A break of one or
two nights during this period can be accepted, but if three nights are missed, the
whole sequence should be repeated.
NOTE: the stars are separated by 8 arcsec, so no finding charts are made. Component
"A" is clearly brighter than "B"
Special Execution Requirements
The two targets are to be observed once per night on five consecutive
nights. A break of one or two nights during this period can be accepted, but if
three nights are missed, the whole sequence should be repeated.
Please note that OB's of runs A and B should not be executed on the same night.
NOTE: the stars are separated by 8 arcsec, so no finding charts are made. Component
"A" is clearly brighter than "B"
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
Last creation of page: Tue Oct 6 15:40:15 2009
If you have comments, please contact usd-help@eso.org