README web version of /home/usg/OPS/MTS/readme_xml/readme_78003607
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
IPOL program of moving targets with R Bessel filter. For each target,
the observations (imaging linear polarization) should be repeated at different phase
angles, as specified in Section "Time-critical aspects.
Each OB consists of acquisition plus16 exposures with the lambda/2 retarder waveplate
at 0, 22.5, 45, ..., 337.5 deg, respectively. All OBs last 2h. OB execution cannot
be
splitted. Target coordinates, as well as additional velocity, must be entered according
to the ephemeris files (see Section "Time-Critical aspects").
If possible at all, please avoid to observe Huya on March 11 because there is a
background object closeby. For the same reason, if possible at all, please avoid
to observe DE9 on December9, on February 11 and 12, on March 12
Waiver Requests
Waiver 178.C-0036H.01 was requested and granted to have OBs that exceed
1h as maximum length, with the restriction that if the conditions degrade in violation
of the constraints after the first hour, the OB will not be repeated.
Critical Observing Condition Constraints
Time-Critical Aspects
Special Execution Requirements
Target coordinates and additional tracking velocity must be typed in before
OB execution based on the ephemeris provided as function of UT with the OB.
OB execution cannot be splitted in two or more parts: if OB is interrupted for any
reason, observations must be resumed immediately, otherwsie the entire OB has to
be classified "C", and its execution repeated. In other words: one cannot execute
half of the OB onenight, and the remaining half another night.
Please have a look at the photon counts and check carefully for (unlikely) saturation
of our target (the magnitude of our targets may be slightly different than expected).
(Perhaps other objects in the field will saturate)
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you have prepared your finding charts with tools other than FIMS,
do they comply with the specifications on the FORS1 Phase 2 web page ?
Last creation of page: Tue Oct 6 15:40:15 2009
If you have comments, please contact usd-help@eso.org