README web version of /home/usg/OPS/MTS/readme_xml/readme_78001200
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
SCIENCE : Follow-up of two bright (V=7.2-7.9) early type SB2 binaries
with periods around or over 1yr
IMMEDIATE AIM OF THE PERIOD: minimizing the gap in the time series between P77 and
P79.
QUALITY REQUIRED: S/N >=250 . This is a critical aspect of the program.
OBJECT OBSERVABILITY : till end of october, from 1st february till end of the period.
OBSERVING STRATEGY : one spectra of each object should be acquired as follows :
* during october (see note)
* before Feb 15th
* end february/begin of march
* after March 15th.
Note : for the october observation, you may relax the constraint on the airmass
if necessary (i.e. better a point under non-optimal conditions that no point at
all). Please coordinate with observations performed at the end of P77. The minimum
separation should be 12 days.
If the previous strategy is not possible (because eg of weather, MPEG time), try
to spread the observations as much as possible. In any case, it is useless to get
spectra separated by less than 12 days.
Waiver Requests
Critical Observing Condition Constraints
The present sources are reasonably bright, this program can thus be performed
in about all seeing and cloud coverage conditions as long as a S/N > 250 is reached.
Target can be observed during twilight.
Exposure times were computed for thin cirrus coverage and seeing below 2". If this
program is adopted as a backup program in the case of bad weather conditions (thick
cirrus, awful seeing, large airmass) which prevent other observations, please increase
the exposure time accordingly. Summing up several successive exposures to achieve
the requested S/N is a valid option.
In any case, whatever the observing conditions, we will extract useful information
from our spectra only if the requested S/N > 250 is reached.
Time-Critical Aspects
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
Did you set 'New Preset' flag in all acquisition templates to 'True'?
If you use any lamp, did you check that it should never be left on at
the end of any OB?
Last creation of page: Tue Oct 6 15:40:14 2009
If you have comments, please contact usd-help@eso.org