README web version of /home/usg/OPS/MTS/readme_xml/readme_77503900
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
Observations should be executed as soon as possible.
Note that we have submitted two OBs for spectropolarimetry. Ideally they should
be executed
one right after the other, which would also save some acquisition time.
If this is not possible, execution on two different nights (as close in time as
possible) is
also acceptable.
Special Execution Requirements
Special Calibration Information
Note that we have supplied a special OB to observe a specphot standard
star with the
polarization optics inserted and only one HWP angle. We have chosen LTT2415, which
has the right spectrum and the appropriate coordinates to be observed towards the
end of the night.
It would be preferable to have it observed right after the SN, but obsrevations
during morning twilight are also acceptable (provided the sky is still dark).
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you have prepared your finding charts with tools other than FIMS,
do they comply with the specifications on the FORS1 Phase 2 web page ?
Last creation of page: Tue Oct 6 15:40:14 2009
If you have comments, please contact usd-help@eso.org