README web version of /home/usg/OPS/MTS/readme_xml/readme_77501800
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
Polarimetric observations of two moving targets, i.e., two fragments of
a comet. We request both IPOL in two narrow band filters, and PMOS with grism 300V,
both circular and linear polarization, plus IMG in two narrow band filters. In addition
to the science program, we request observations of a specphot standard star in IMG
mode with the two narrow band filters.
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
Special Execution Requirements
Since our targets are moving targets, coordinates and additional tracking
velocity should be entered by the support astronomer as specified in the attached
ephemeris. For IPOL observations, this will be sufficient. For PMOS observations,
we ask the support astronomer to enter also the position angle specified in the
ephemeris. Note that in the ephemeris the PA is positive North to South, whereas
in the OB the position angle should be given with the opposit sign.
Ideally, observations of circular polarization and linear polarization in the same
mode and for the same fragment should be executed in the same night. E.g.:
PMOS LIN and PMOS CIR for fragment B should be executed in the same night
IPOL LIN and IPOL CIR for fragment B should be exectued in the same night
PMOS LIN and PMOS CIR for fragment C should be executed in the same night
IPOL LIN and IPOL CIR for fragment C should be executed in the same night
Finally, ideally, IMG for fragment B and IMG for fragment C and IMG standard star
should be executed in the same night.
Special Calibration Information
We have included a night time calibration OB for observations of a specphot
standard star in IMG mode with the three narrow band filters.
Twilight skyflats with no polarimetric optics in should be taken in the three narrow
band filters (OII+44, SII/4500+64, SIII+65)
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you have prepared your finding charts with tools other than FIMS,
do they comply with the specifications on the FORS1 Phase 2 web page ?
Last creation of page: Tue Oct 6 15:40:14 2009
If you have comments, please contact usd-help@eso.org