README web version of /home/usg/OPS/MTS/readme_xml/readme_77501600
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
The goal of this run (A) is to obtain high resolution spectra with UVES
in DIC#1 and DIC#2 of the 2 brightest fragments (C and B) of the split comet 73P/SW-3.
The ToO will be triggered when the comet is in outburst (sometime before June 20).
- Precise coordinates (RA and DEC),
- Differential tracking rates,
- And the position angle (PsAng)
must be updated for each observation before starting the OBs (see execution requirements),
using the ephemeris which will be sent with the activation.
There are 4 OBs of 1h30m, 2 for each objet (1 DIC#1 and 1 DIC#2 OB) :
MOV_Comet73P_B_DIC1 : DIC#1 350+580 (slit=0.5 arcsec, SKY, ADC)
MOV_Comet73P_B_DIC2 : DIC#2 437+860 (slit=0.5 arcsec, SKY, ADC)
MOV_Comet73P_C_DIC1 : DIC#1 350+580
MOV_Comet73P_C_DIC2 : DIC#2 437+860
As we are observing an extended object moreover at high airmass and with a given
slit orientation we use the SKY option with the ADC.
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
- The coords need to be filled at the precise time 2 min of the preset
because it is a very fast moving object (to get it right in the small UVES FOV)
- The comet is only visible at the end of the night during about 2 hours. The OBs
are 1.5h long so only 1 OB can be done per night. The OB needs to be started not
too late in order to have enough time to complete it properly. 15 minutes of twilight
can be used without problem!
- When one OB is executed for one of the fragment, the 2d OB should be executed
as close as
possible to it (in one of the next following night). The 2d trigger and the 4rth
will then be sent very close to 1rst and 3rd.
Special Execution Requirements
- *Choice of Guide Star* ! : The comet is a very fast moving object :
6 arcmin in 1h30m. The guide star will need to be chosen *very* carrefully to avoid
to change the GS during the long exposure (and of course avoid to cross the UVES
FOV). The comet is moving nearly exactly to the South-East. So the GS needs to be
chosen in that direction to maximise the time to keep it in the guide probe.
This strategy has already been done in the past and works very well.
In case a change of GS needs to be done the exposure needs to be PAUSED before changing
the GS, then the comet nucleus put back on the slit (in case it goes out) and then
the exposure CONTINUED.
- As our targets are moving objects, the following quantities need to be updated
in the OB before execution :
1) the precise coordinates (those in the OBs are just indicative)
under the columns : R.A._(ICRF/J2000.0) and _DEC
The 2 fragments are bright (V = 7-8 mag) and will be easy to identify.
If you dont see the comet, please look again the ephemeris, especially the UT date.
2) the additional tracking velocities
under the columns : dRA*cosD and d(DEC)/dt
If the comet is moving with respect to the slit during the exposure,
this means that the diff. tracking was not properly set ! Please look again the
ephemeris, especially the UT date.
3) the Position Angle (to have the slit along the comet tail)
under the column : PsAng (given in degrees and measured from N-->E)
These quantities are to be taken from the provided - 1 min steps- ephemeris.
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you need secondary guiding, are there suitable objects within 30 arcsec
from your target ?
Last creation of page: Tue Oct 6 15:40:14 2009
If you have comments, please contact usd-help@eso.org