README web version of /home/usg/OPS/MTS/readme_xml/readme_77501300
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
This is a simple UVES/DIC1 programme on the neraby SN2006X (V~17.0) aimed
at studying the interstellar features NaI D and CaII H&K lines. Observations
have to be performed as soon as possible, since the SN is setting rather soon.
We have supplied 5 OBs (_F1, _F2, ..., _F5).
Note that data should be made available to the PI as soon as possible, using one
of the ToO
accounts.
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you need secondary guiding, are there suitable objects within 30 arcsec
from your target ?
Last creation of page: Tue Oct 6 15:40:14 2009
If you have comments, please contact usd-help@eso.org