README web version of /home/usg/OPS/MTS/readme_xml/readme_77500300
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
This is a simple UVES/DIC1 programme on the bright SN2006X (V~16.0) aimed
at studying the
interstellar features NaI D and CaII H&K lines. Observations have to be performed
as soon as possible, since the SN is already past maximum light and the brightness
will decrease rather fast from now on.
We have supplied 5 OBs (_1, _2 , ..., _5). They are all identical.
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
OBs have to be executed as soon as possible. If needed, they can be spread
over different nights. To optimize the execution procedure, one can execute a few
of them in a raw, just skipping the acquisition after the first OB.
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you need secondary guiding, are there suitable objects within 30 arcsec
from your target ?
Last creation of page: Tue Oct 6 15:40:14 2009
If you have comments, please contact usd-help@eso.org