README web version of /home/usg/OPS/MTS/readme_xml/readme_77083701
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
This program is set to obtain a long 18h integration time in each of LRBLUE
and LRRED, through the same mask. This will be repeated for 3 different VIMOS pointings
to complete the LP. Each 18h integration is cut in 11 OBs, with the objects moved
along the slit at positions 0, 0.3, 0.6, 0.9, 1.2, 1.5, -0.3, -0.6, -0.9, -1.2,
-1.5, respectively. Each OB includes 4 exposures of 1473 sec, and one wavelength/arc
calibration, for a total execution time of 2h08m. For P77, 36.417h are scheduled
out of 37h allocated, this allows to do 11 OBs (18h integration) for one mask with
LRBLUE, and another 6 OBs (9.8h integration) for the same mask with LRRED.
Waiver Requests
The following waivers have been submitted:
1. Work at rotator on sky = 0 (as for pre-images): this has been approved 31 July
2006
2. Use OBs longer than 1h: this has been approved 31 July 2006
3. Do only a couple of wavelength/arc calibration for each sequence of 11 identical
OBs: this has unfortunately been refused. We do not think it is necessary to obtain
11 times the same information,
as wavelength calibration is systematically adjusted on sky lines positions by our
VIPGI pipeline.
4. Allow to take exposures up to airmass = 1.5, this has been approved 2 Aug. 2006
Critical Observing Condition Constraints
Time-Critical Aspects
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
Did you specify suitable guide stars for all your OBs using Guidecam
?
Did you check that the chosen guide stars are suitable for all the offset
positions and that they do not produce unacceptable vignetting of the field of view
?
Last creation of page: Tue Oct 6 15:40:14 2009
If you have comments, please contact usd-help@eso.org