README web version of /home/usg/OPS/MTS/readme_xml/readme_77081900
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
For each target (science and standard stars), we will obtain an acquisition
image, in order to center the object on the 1046,1076 pixel.
Then we will image in polarimetric mode, at four different Wollaston prism angles,
3 to 5 individual integrations.
We propose to reobserve three targets (LHS_102B, 2MASS_J0036+18 and 2MASS_J2244+20),
with a flexible time delay (but not in the same night). The second observation has
a lower priority.
Some targets may have a nearby object. As long as both objects appear in the IPOL
strip, we'll be able to get polarimetric measurements, so identifying which is which
is not crucial.
All observations use the I_BESS filter, except for targets 2MASS_J1207-39, GY_5
and UScoCTIO_112, for which we alse ask for a R_BESS measurement (with lower priority).
The optimal time delay would be within the same night, but any delay is acceptable.
Waiver Requests
Critical Observing Condition Constraints
All targets can be observed with thin cirruses, with seeing up to 1.4"
(some seeing incursions to larger values are acceptable), as stated in the OBs and
in the proposal. Some isolated bright targets can be observed with a higher seeing
(up to ~1.6").
Exposure times have been calculated for a seeing a 1". A better seeing would result
in saturation problems (relatively long exposure times are required to obtain an
SNR>~3000 while keeping overheads low).
Time-Critical Aspects
We propose to observe three targets twice: LHS_102B, 2MASS_J0036+18 and
2MASS_J2244+20. The second observations can take place at any time, but not in the
same night as the first night.
On the contrary, R_BESS observations could take place at any time after the I_BESS
observations, and preferentially within the same night.
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you have prepared your finding charts with tools other than FIMS,
do they comply with the specifications on the FORS1 Phase 2 web page ?
Last creation of page: Tue Oct 6 15:40:14 2009
If you have comments, please contact usd-help@eso.org