README web version of /home/usg/OPS/MTS/readme_xml/readme_77074502
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
The FORS2 run (run C) is meant to be ancillary to the SINFONI run B. We
want to derive the redshifts of a sample of 10 EROs, selected in our K-band AO assisted
imaging combined with optical data. This would allow us to select the appropriate
gratings for SINFONI to observe a bright redshifted optical line (run B), and derive
kinematics and star formation properties of dusty starburst galaxies selected as
EROs at AO resolution.
The 10 EROs are selected in two different fields. For one of the fields, two pointing
are needed to put the slits on all the targets.
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you have prepared your finding charts with tools other than FIMS,
do they comply with the specifications on the FORS2 Phase 2 web page ?
Last creation of page: Tue Oct 6 15:40:14 2009
If you have comments, please contact usd-help@eso.org