README web version of /home/usg/OPS/MTS/readme_xml/readme_77065300
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
Observation of HD128898 with the instrument AMBER (one calibrated point)
with the immediate objective of determining its angular diameter with an accuracy
of 7% or better.
From 15 of July 2006 to 30 of September 2006 the target is not observable (insufficient
time up).
Two finding charts are attached to the science OB (SCI_HD128898). The first is the
required chart in the optical and the second is a finding chart in the K band, where
a second source, of lower magnitude in K is seen to exist not far from the target
source.
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
Special Execution Requirements
Despite the fact that the quality of H-data is not guaranteed, we do not
want to give-up the data in the H band as these data can improve significantly our
measurement.
However, since we can gain in using IRIS as well, we propose that the execution
is carried out according to the following steps:
(1) first point the target with IRIS (the gain in observing time/overhead is important)
and acquire interferometric data in this mode in K band.
(2) second, remove IRIS and record interferometric data in H and K bands in a"blind"
mode.
Special Calibration Information
Two possible calibrators were selected from CalVin. Our first choice calibrator
is HD148890
(OB NAME: CAL_HD148890).
However, beacause this star is 11.8 degrees away from our science target (HD128898),
we have produced an alternative OB for a second choice calibrator HD133869 (OB NAME:
CAL_HD133869), which is only 4.6 degrees away from the science target. This calibrator
should be used only if it is not possible to use our first choice calibrator.
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
Did you indicate for each science star OB the corresponding calibrator
star OB (and vice versa) in the 'Instrument Comments' field ?
If you use calibrator stars which are not in the CalVin database, did
you specify their characteristics in the README file and in the OBs ?
Last creation of page: Tue Oct 6 15:40:13 2009
If you have comments, please contact usd-help@eso.org