README web version of /home/usg/OPS/MTS/readme_xml/readme_77061502
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
This program is the continuation of Program 177.B-0615(B) which is a long-term
spectrophotometric monitoring of the "Einstein Cross", in view of a study of chromatic
microlensing. Accurate mask alignment both of the PSF stars AND the target is *crucial*.
We have planned 13 epochs, with two masks per epoch. The epochs are separated by
about 15 days (sometimes 1 months when no service runs are planned with FORS1).
If technical time becomes available, please don't hesitate to run OBs that were
previously not run, e.g., due to bad weather. The following tentative schedule
http://obswww.unige.ch/~eigenbro/Q2237.html gives the ideal observing dates, given
the moon illumination and moon distance. We have tried to put our prefered dates
during planned service mode runs, as scheduled on the ESO pages. Please tell us
if this schedule is modified. We will update our page regularly.
A key issue is to keep as close as possible to the 15 days sampling and to execute
the "mask1" and "mask2" OBs of the same epoch on the same night or on two consecutive
nights max. It is also very important to continue the observations as long as possible
in the period, even at high airmass.
Waiver Requests
Critical Observing Condition Constraints
Observations with conditions slightly worse than those specified are still
acceptable in exceptional cases --> we prefer getting good temporal sampling
and good temporal coverage in conditions slightly off the ideal, rather than always
excellent weather conditions but sparce sampling. This should however be applied
*only* if one or several epochs have been missed due, e.g. to very bad weather.
In practice we can accept seeing up to 0.9 arcsec.
However, note that this is the kind of program that will not be hurt by excellent
seeing, if possible at all.
Time-Critical Aspects
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you have prepared your finding charts with tools other than FIMS,
do they comply with the specifications on the FORS1 Phase 2 web page ?
Last creation of page: Tue Oct 6 15:40:13 2009
If you have comments, please contact usd-help@eso.org