README web version of /home/usg/OPS/MTS/readme_xml/readme_77052100
Principal Investigator Email Address
Estimated Total Execution Time (hours, including overheads)
General Description
Two equal sets of UVES spectra of three Young Stellar Objects.
We want to obtain high S/N (> 200) spectra of the three objects in
order to study the [OI] 6300,6363 Angstroms lines produced in the surface
of the rotating disks around these stars.
We want to compare these spectra to the MIDI observations. Aim of the program is
to study the thermal coupling state of the gas and the dust in the proto-planetary
disks. Due to the variability of the sources emission the UVES spectra need to be
carried out within 3 or four weeks from each MIDI observation.
Waiver Requests
Critical Observing Condition Constraints
Time-Critical Aspects
Due to the variability of the sources, the UVES spectra of each
target have to be taken within 3 or 4 weeks from the MIDI observations
of the same target.
The run consists of 4 OBs per target. The OBs differ only for the slit's PA:
two different slit's orientation are selected, 0 and 90 degree.
The UVES OBs whose name is labelled with "B1":
HD101412_UVES_B1_0, HD101412_UVES_B1_90,
HD135344_UVES_B1_0, D135344_UVES_B1_90,
HD179218_UVES_B1_0, HD179218_UVES_B1_90,
need to be excetuuted within 3 or 4 weeks from the run B.
The UVES OBs whose name is labelled with "B2":
HD101412_UVES_B2_0, HD101412_UVES_B2_90,
HD135344_UVES_B2_0, D135344_UVES_B2_90,
HD179218_UVES_B2_0, HD179218_UVES_B2_90,
need to be excetuuted within 3 or 4 weeks from the run C.
Special Execution Requirements
Special Calibration Information
ToO Information
ToO Activators List
Is this a Pre-imaging run ?
Pre-imaging Requirements
Source(s) of Pre-imaging
Pre-imaging sources not listed above
Do all your OBs comply with the instrument-specific requirements listed
on the instrument-specific Phase 2 web page ?
If this is a pre-imaging run, did you select PRE-IMAGING for the Observing
Category for each Observing Template ?
Do all your finding charts comply with both the general and instrument-specific
Phase 2 Web Pages ?
If you submitted OBs for standard stars, did you specify the magnitude
and spectral type of all standard stars in the OBs ?
Have you included OBs for any calibrations that you need but which are
not part of the Calibration Plan ?
If you are observing Moving Targets, have you attached suitable ephemeris
files to your OBs?
If you have preferences which OBs should be executed first, did you make
use of the User Priority field in the OBs ?
If this is a run that requires coordinated observations with other facilities,
did you give proper instructions in the Time-Critical Aspects Section ?
If you need secondary guiding, are there suitable objects within 30 arcsec
from your target ?
Last creation of page: Tue Oct 6 15:40:13 2009
If you have comments, please contact usd-help@eso.org